Scale a pressure input with a nonzero lower range
Set the transmitter range to 2 through 10 bar. At 4 mA the pressure is 2 bar. At 12 mA it is 6 bar. The intermediate fraction represents the position within the 8 bar span, so adding the lower value is essential.
Try the exercise
Enter 4, 8, 12, 16 and 20 mA in order. Record the expected pressures of 2, 4, 6, 8 and 10 bar. Then inspect a diagnostic current and distinguish its numerical extrapolation from a valid process measurement.
Common fault or interpretation error
Assuming a diagnostic limit proves a broken wire overlooks transmitter configuration and receiver behavior. Use the model's status as a category to investigate.
Frequently asked question
Why does 12 mA represent the midpoint although 12 is not half of 20?
The useful signal starts at 4 mA. Subtract the live zero and divide by the 16 mA span. Twelve minus four is eight, half of that span.
A simple practice routine
- Identify the supply, the load and the control devices before changing the example. Read the terminal names and compare them with the linked guide.
- Make one change, then observe the effect. For a circuit, use the diagram and connection check; for a calculator, check the units and the formula.
- Return the example to its original condition and repeat the task. Save or export a project from its Project menu before leaving if you need a permanent copy.
Understand the example
Formula and worked example
Value = LRV + (mA − 4) / 16 × (URV − LRV)
0 + (12 − 4) / 16 × (10 − 0)
5 (50 %) · Signal status: Normal
What to understand
A current loop sends the same current through every part of a series circuit, so long cables and connection resistance do not change the reading. The receiver measures the current, usually as the voltage across a known resistor such as 250 Ω, which turns 4–20 mA into 1–5 V.
The zero point is 4 mA, not 0 mA. This "live zero" means a broken wire (0 mA) can be told apart from a real minimum value.
Converting a current to a process value is a straight line: value = LRV + (I − 4) / 16 × (URV − LRV). For a level transmitter ranged 0–5 m, 12 mA is the middle: 2.5 m. The reverse is I = 4 + 16 × (value − LRV) / (URV − LRV).
A 2-wire transmitter takes its own power from the loop. A 24 V DC supply drives current through the transmitter and the input resistor; the transmitter regulates that current. The voltage left at the transmitter at 20 mA must stay above its minimum operating voltage from the data sheet, after subtracting the drop across the input and the cable.
Example: 24 V supply, 250 Ω input and 20 Ω of cable at 20 mA leaves 24 − 0.02 × 270 = 18.6 V at the transmitter.
Many transmitters follow the NAMUR NE 43 recommendation: currents at or below about 3.6 mA or at or above about 21 mA indicate a device fault rather than a measurement. A PLC can use those limits to raise a "transmitter fault" alarm and move the control to a safe action, as the pump station example in PlantFlow 3D does.
Open PLC & Process, then set the LT-101 fault to "open loop". Watch the PLC detect the fault and switch to the backup level switch. Use Tools → 4–20 mA to practise conversions.