Compare running demand with a motor-start scenario
List the loads that are already running before the largest motor starts. Keep the starting motor's normal running contribution separate so it is counted once. The estimate depends on the starting method and the assumptions used for the transient demand.
Try the exercise
Compare the same motor under the available starting-method assumptions. Record the steady demand and the start case separately. Identify which one determines the provisional capacity. Obtain the generator manufacturer's transient curves before using the example for equipment selection.
Common fault or interpretation error
Adding the entire plant demand to a starting estimate that already includes the largest motor can double-count its normal contribution. Define the snapshot first.
For a second scenario, change the order in which motors start. Note which loads are already online at the instant the largest motor is requested. A revised starting sequence can change the worst transient combination even though the list of connected equipment is identical.
Frequently asked question
Why can a generator carry a motor after a failed starting attempt?
Steady running current is lower than many starting currents. Voltage and frequency recovery during acceleration can be limiting even when continuous kW and kVA fit the nameplate.
A simple practice routine
- Identify the supply, the load and the control devices before changing the example. Read the terminal names and compare them with the linked guide.
- Make one change, then observe the effect. For a circuit, use the diagram and connection check; for a calculator, check the units and the formula.
- Return the example to its original condition and repeat the task. Save or export a project from its Project menu before leaving if you need a permanent copy.
Understand the example
Formula and worked example
S_run = P / cos φ; S_start = √3 × V × I_FL × k_start
S_run = 75 kVA; I_FL ≈ 28.3 A; S_start = 43.14 kVA (k = 2.2)
≈ 99 kVA
Rough planning estimate. The generator manufacturer's sizing tool decides the final rating.
What to understand
Hospitals, fire pumps, data rooms and many factories have loads that must keep running when the mains fails. An automatic transfer switch watches the mains. When it fails, the ATS starts a standby generator and moves the load to it. When the mains returns, it moves the load back.
A typical open-transition sequence is: confirm the mains failure for a short time (to ignore brief dips), send the start signal to the generator, wait until the generator voltage is healthy, open the mains contactor, wait a short dead time, then close the generator contactor. On mains return it waits a return delay to be sure the mains is stable, transfers back the same way, and lets the generator run unloaded for a cool-down time before stopping it.
The mains and the generator are separate sources with different phase angles. Connecting them together would cause a huge current. The mains and generator contactors are therefore interlocked electrically (each coil circuit passes through a normally-closed auxiliary contact of the other) and often mechanically as well. Closed-transition transfer, where both are briefly connected, needs synchronising equipment and the approval of the supply authority.
An ATS should be tested regularly by simulating a mains failure, checking the start, transfer, return and cool-down times, and confirming that the essential load really runs on the generator.
Choose “ATS” in the simulator, press “simulate failure” and follow each step of the transfer in the status bar. Then try the troubleshooting challenges.
Continue learning
Automatic transfer switches (ATS) for standby generators
Learning model: follow equipment instructions and applicable local rules for real installations. A simulated check is not installation approval.