Separate connected load from an assumed operating case
List each feeder and identify whether its rating represents input, output or apparent power. Give the running and standby pumps different rows. A standby unit contributes to connected load even when the operating case calls for only one duty unit.
Try the exercise
Build two schedules on paper alongside the tool. In one case both loads run, and in the second one is standby. Track the changed assumption separately from each unchanged nameplate rating. Carry the total into a transformer or generator comparison only after you know its units.
Common fault or interpretation error
Adding a motor's mechanical output directly to electrical input loads understates demand. Convert using a justified efficiency and identify its source.
When a teacher changes one duty pump into a standby pump, keep both original nameplate entries visible. Add an operating-case column rather than deleting equipment from the connected list. This preserves traceability from the final total back to the equipment schedule.
Frequently asked question
Why can a schedule show two correct totals for the same equipment?
A connected total and a simultaneous demand answer different questions. The result depends on the stated operating scenario, diversity assumptions and whether the units are kW or kVA.
A simple practice routine
- Identify the supply, the load and the control devices before changing the example. Read the terminal names and compare them with the linked guide.
- Make one change, then observe the effect. For a circuit, use the diagram and connection check; for a calculator, check the units and the formula.
- Return the example to its original condition and repeat the task. Save or export a project from its Project menu before leaving if you need a permanent copy.
Understand the example
For a three-phase motor the input power is P_in = P_out / η, and the line current is I = P_out / (√3 × V × pf × η). Here P_out is the rated shaft power in watts, V the line voltage, pf the power factor and η the efficiency.
Example: 7.5 kW, 400 V, pf 0.85, η 0.90 gives I = 7500 / (1.732 × 400 × 0.85 × 0.90) ≈ 14.2 A. PlantFlow 3D shows this as a calculated estimate.
Real motors differ: efficiency and power factor change with size, speed and design, and the manufacturer has measured the actual rated current. Whenever the nameplate current is known, use it for the overload setting and for checking cables and switchgear. The simulator marks calculated values as estimates and lets you enter the nameplate value.
The rated current sets the thermal overload relay, guides the contactor size (utilisation category AC-3 for squirrel-cage motors), and is the design current for the cable check together with the cable length, installation method and voltage drop limit.
Starting current is several times the rated current for a direct-on-line start. The exact ratio comes from the motor data sheet. In the simulator it is a teaching assumption that you can change.
Cable current ratings depend on conductor size, insulation, installation method, ambient temperature and grouping. These values come from the cable manufacturer or the standard that applies to your project. PlantFlow 3D does not include those tables: you enter the verified rating and correction factors, and it checks the coordination and voltage drop.
Open Tools → Cable check, link it to motor M1 and enter your cable data. Change the motor power in the Data tab and see the load schedule update automatically.
Continue learning
Motor full-load current and overload settings
Learning model: follow equipment instructions and applicable local rules for real installations. A simulated check is not installation approval.