Home / Calculators / Transformer size calculator

Calculators

Transformer size calculator

Apply a growth margin to a kVA load and compare common transformer sizes.

Change a number below. The formula, working and result update together.

Open tool

Convert load demand to a candidate transformer rating

Start with real power and a declared power factor. A 40 kW demand at 0.8 requires 50 kVA before additional allowance. If you add 20 percent planning margin the resulting 60 kVA requirement differs from the nameplate rating of the candidate you choose.

Try the exercise

Check the selected standard size against the calculated requirement. Remove the margin for a second case. Record any jump to the next available rating and distinguish this discrete change from the underlying arithmetic.

Common fault or interpretation error

Multiplying electrical demand by power factor when converting kW to kVA understates the requirement. Divide kW by power factor for this conversion.

Record both the minimum calculated kVA and the next catalog rating. If the supply arrangement changes, retain the original worksheet as a separate revision.

Frequently asked question

Can the next listed size be ordered on the basis of this result?

It is a planning candidate. Frequency, primary and secondary voltages, ambient conditions, impedance and the load profile influence selection. Also review inrush and any nonlinear loads.

A simple practice routine

  1. Identify the supply, the load and the control devices before changing the example. Read the terminal names and compare them with the linked guide.
  2. Make one change, then observe the effect. For a circuit, use the diagram and connection check; for a calculator, check the units and the formula.
  3. Return the example to its original condition and repeat the task. Save or export a project from its Project menu before leaving if you need a permanent copy.

Understand the example

Formula and worked example

S_required = S_load × (1 + margin)

280 × 1.25 = 350 kVA

350 kVA → 400 kVA

Next common size (check with the manufacturer)

What to understand

The capital D means the high-voltage winding is connected in delta. The small y means the low-voltage winding is in star, and n means its star point is brought out as the neutral. The number 11 means the LV voltages lead the HV voltages by 30° (11 o’clock on a clock face).

Because the LV side is star with a neutral, it supplies 400 V between phases and 230 V from each phase to neutral, which is exactly what buildings and plants need.

A transformer keeps power roughly the same on both sides, so current scales inversely with voltage: I1 ≈ I2 × V2 / V1. A 100 kVA transformer at 400 V delivers up to about 144 A, while drawing only about 5.2 A at 11 kV. The impedance voltage uk (often 4–6 %) limits the short-circuit current on the LV side.

In a delta–star transformer each LV phase winding sits on the same core as one HV winding connected between two HV phases. If one HV phase is lost, two HV windings lose part of their supply and the LV voltages become unbalanced. Three-phase motors on the LV side then run single-phased and their overload relays must trip them.

A control transformer, for example 400/230 V, takes two phases on its primary H1–H2 and gives an isolated control supply on its secondary. The secondary is protected by its own MCB or fuse and one side is usually earthed. Its VA rating must cover all coils and lamps; contactor coils draw several times more VA when pulling in than when holding, so size it from the manufacturer’s data.

Open the MCC circuit, choose the multimeter and measure T1.2U–T1.2V (400 V), T1.2U–T1.2N (230 V) and T2.L–T2.N (230 V control).

Continue learning

Distribution transformer Dyn11 and control transformer explained

Learning model: follow equipment instructions and applicable local rules for real installations. A simulated check is not installation approval.